A job shop production system processes after set up batches of products in some specific sequences. In the modern production the product's process cycle is not always known from the beginning. The paper faces scheduling problems within a flexible production system with unknown production cycle, multiple products-machines and a multi-objective approach, aiming to minimize the makespan and to improve the machinery utilization. A metaheuritic optimization model is described and the obtained results from an industrial application are compared with the classical scheduling priority rules and with Johnson’s heuristics.

Scheduling in a Job Shop Production System with multiple parallel Machines and multiple Products in case of Unknown Process Cycle

AZZI, ANNA;FACCIO, MAURIZIO;PERSONA, ALESSANDRO;SGARBOSSA, FABIO
2010

Abstract

A job shop production system processes after set up batches of products in some specific sequences. In the modern production the product's process cycle is not always known from the beginning. The paper faces scheduling problems within a flexible production system with unknown production cycle, multiple products-machines and a multi-objective approach, aiming to minimize the makespan and to improve the machinery utilization. A metaheuritic optimization model is described and the obtained results from an industrial application are compared with the classical scheduling priority rules and with Johnson’s heuristics.
2010
PROCEEDING OF EURO 2010: 24 TH EUROPEAN CONFERENCE ON OPERATION RESEARCH, Lisbon 11-14 July 2010
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/2436735
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact