The requirements of ITER neutral beam injectors (1 MeV, 40 A negative deuterium ion current for 1 h) have never been simultaneously attained; therefore, a dedicated Neutral Beam Test Facility (NBTF) was set up at Consorzio RFX (Padova, Italy). The NBTF includes two experiments: SPIDER (Source for the Production of Ions of Deuterium Extracted from Rf plasma), the full-scale prototype of the source of ITER injectors, with a 100 keV accelerator, to investigate and optimize the properties of the ion source; and MITICA, the full-scale prototype of the entire injector, devoted to the issues related to the accelerator, including voltage holding at low gas pressure. The present paper gives an account of the status of the procurements, of the timeline, and of the voltage holding tests and experiments for MITICA. As for SPIDER, the rst year of operation is described, regarding the solution of some issues connected with the radiofrequency power, the source operation, and the characterization of the rst negative ion beam.

First operation in SPIDER and the path to complete MITICA

Serianni, G.
;
Chitarin, G.;Grando, L.;Luchetta, A.;Pasqualotto, R.;Zanotto, L.;Agostinetti, P.;Agostini, M.;Aprile, D.;Barbisan, M.;Canton, A.;Dalla Palma, M.;Dan, M.;De Muri, M.;Denizeau, S.;Fadone, M.;Fellin, F.;Gambetta, G.;Gasparini, F.;Gnesotto, F.;Jain, P.;Maistrello, A.;Manduchi, G.;Marconato, N.;Moresco, M.;Patton, T.;Pilan, N.;Pimazzoni, A.;Piovan, R.;Poggi, C.;Recchia, M.;Rostagni, G.;Sartori, E.;Siragusa, M.;Sonato, P.;Spagnolo, S.;Ugoletti, M.;Zaniol, B.;Zaupa, M.;Veltri, P.;Gomez, G.;Cristofaro, S.;Fantz, U.;
2020

Abstract

The requirements of ITER neutral beam injectors (1 MeV, 40 A negative deuterium ion current for 1 h) have never been simultaneously attained; therefore, a dedicated Neutral Beam Test Facility (NBTF) was set up at Consorzio RFX (Padova, Italy). The NBTF includes two experiments: SPIDER (Source for the Production of Ions of Deuterium Extracted from Rf plasma), the full-scale prototype of the source of ITER injectors, with a 100 keV accelerator, to investigate and optimize the properties of the ion source; and MITICA, the full-scale prototype of the entire injector, devoted to the issues related to the accelerator, including voltage holding at low gas pressure. The present paper gives an account of the status of the procurements, of the timeline, and of the voltage holding tests and experiments for MITICA. As for SPIDER, the rst year of operation is described, regarding the solution of some issues connected with the radiofrequency power, the source operation, and the characterization of the rst negative ion beam.
File in questo prodotto:
File Dimensione Formato  
201_firstOperationSPIDER1.5133076.pdf

accesso aperto

Tipologia: Published (publisher's version)
Licenza: Accesso gratuito
Dimensione 5.89 MB
Formato Adobe PDF
5.89 MB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/3326257
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 47
  • ???jsp.display-item.citation.isi??? 43
social impact