PILAN, NICOLA
 Distribuzione geografica
Continente #
NA - Nord America 2.292
EU - Europa 609
AS - Asia 201
OC - Oceania 1
Totale 3.103
Nazione #
US - Stati Uniti d'America 2.290
IT - Italia 376
CN - Cina 147
DE - Germania 68
FI - Finlandia 50
IN - India 26
SE - Svezia 23
FR - Francia 21
GB - Regno Unito 21
RU - Federazione Russa 13
IE - Irlanda 11
VN - Vietnam 11
NL - Olanda 7
SG - Singapore 6
UA - Ucraina 6
HK - Hong Kong 5
ES - Italia 4
CA - Canada 2
IR - Iran 2
JP - Giappone 2
LU - Lussemburgo 2
PL - Polonia 2
BE - Belgio 1
CH - Svizzera 1
GR - Grecia 1
ID - Indonesia 1
NO - Norvegia 1
NZ - Nuova Zelanda 1
PT - Portogallo 1
UZ - Uzbekistan 1
Totale 3.103
Città #
Fairfield 409
Chandler 261
Woodbridge 221
Ashburn 215
Padova 165
Houston 161
Seattle 157
Cambridge 142
Wilmington 127
Ann Arbor 126
Beijing 70
Medford 33
Princeton 33
San Diego 30
Jacksonville 23
Helsinki 22
New York 22
Des Moines 21
Boardman 17
Nanjing 17
Roxbury 16
Lappeenranta 15
Dong Ket 11
Milan 11
Los Angeles 10
Meduno 7
Amsterdam 6
Cagliari 6
Dearborn 6
Guangzhou 6
London 6
Nanchang 6
Norwalk 5
Singapore 5
Venezia 5
Garching 4
Genoa 4
Grafing 4
Hebei 4
Hong Kong 4
Jinan 4
Krasnoobsk 4
Madrid 4
Paris 4
Prevessin-Moens 4
Tianjin 4
Verona 4
Brendola 3
Dublin 3
Hefei 3
Hounslow 3
Jiaxing 3
Menlo Park 3
Ogden 3
Pune 3
Riva del Garda 3
Shenyang 3
Venice 3
Véry 3
Washington 3
Arzignano 2
Auburn Hills 2
Borås 2
Delhi 2
Falkenstein 2
Gandhinagar 2
Kochi 2
Mascalucia 2
Montebelluna 2
Redwood City 2
Rimini 2
Rome 2
Shanghai 2
Vicenza 2
Acton 1
Ahmedabad 1
Albignasego 1
Auckland 1
Baotou 1
Bologna 1
Brescia 1
Campodarsego 1
Carbonera 1
Changsha 1
Chongqing 1
Collecchio 1
Como 1
Costabissara 1
Daqing 1
Dongguan 1
Florence 1
Frankfurt am Main 1
Frensdorf 1
Haikou 1
Hangzhou 1
Kunming 1
Lucca 1
Lusia 1
Makishi 1
Monfalcone 1
Totale 2.534
Nome #
Progress in the ITER neutral beam test facility 198
SPIDER in the roadmap of the ITER neutral beams 172
A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility 169
Detailed design optimization of the MITICA negative ion accelerator in view of the ITER NBI 151
Start of SPIDER operation towards ITER neutral beams 147
MITICA intermediate electrostatic shield: Concept design, development, and first experimental tests identification 138
The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors 135
Evidences of accumulation points in cascade regenerative phenomena observed in high voltage dc devices insulated by long vacuum gaps 119
First operation in SPIDER and the path to complete MITICA 118
Final design of the beam source for the MITICA injector 111
The ITER Neutral Beam Test Facility toward SPIDER operation 106
Design of a low voltage, high current extraction system for the ITER Ion Source 104
Electrical and structural R&D activities on high voltage dc solid insulator in vacuum 101
Current Signals and X- Ray Spectra Analysis for a Vacuum High Voltage Holding Experiment 100
Prediction of lightning impulse voltage induced breakdown in vacuum interrupters 96
Prediction of lightning impulse voltage induced breakdown in vacuum interrupters 86
On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress 86
Numerical-Experimental Benchmarking of a Probabilistic Code for Prediction of Voltage Holding in High Vacuum 84
Technological aspects of the different schemes for accelerator and ion source of the ITER Neutral Beam Injector 80
Physics design of the injector source for ITER neutral beam injector (invited) 80
Voltage holding optimization of the MITICA electrostatic accelerator 77
Electrical diagnostics for high voltage tests in MITICA 73
Design of a System for Performing High-Voltage Holding Test Campaigns on a Mockup of MITICA Negative Ion Source 72
A novel tool for breakdown probability predictions on multi-electrode multi-voltage systems 71
A new deflection technique applied to an existing scheme of electrostatic accelerator for high energy neutral beam injection in fusion reactor devices 71
SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection 62
First operations with caesium of the negative ion source SPIDER 58
Conceptual design of the beamline for the DTT Neutral Beam Injector following a double beam source design approach. 57
Pre-breakdown phenomena between electrodes in vacuum: the role of accumulation points in the onset of microdischarges 44
Progress in the MITICA beam source design 42
Strategy for Vacuum Insulation Tests of MITICA 1 MV Electrostatic Accelerator 38
Studies and analyses for the design of an electrostatic accelerator for the ITER Neutral Beam Injector 31
Lessons learned after three years of SPIDER operation and the first MITICA integrated tests 30
Improved Conceptual Design of the Beamline for the DTT Neutral Beam Injector 25
Pre-Breakdown Phenomena Between Vacuum Insulated Electrodes: The Role of Accumulation Points in the Onset of Microdischarges 23
Optical Diagnostics for High-Voltage Tests in MITICA 22
HV Holding in Vacuum, a Key Issue for the ITER Neutral Beam Injector 15
Design of electrodes for high voltage tests in MITICA 11
Highlights of recent SPIDER results and improvements 10
Analysis and characterization of X-ray events in medium voltage vacuum interrupters under Lightning Impulse Voltage 6
Electrostatic Design of the MITICA Intermediate Electrostatic Shield 2
Role of Electron Stimulated Desorption in the initiation of HVDC vacuum arc 1
Totale 3.222
Categoria #
all - tutte 12.363
article - articoli 9.493
book - libri 0
conference - conferenze 0
curatela - curatele 0
other - altro 0
patent - brevetti 0
selected - selezionate 0
volume - volumi 821
Totale 22.677


Totale Lug Ago Sett Ott Nov Dic Gen Feb Mar Apr Mag Giu
2018/2019163 0 0 0 0 0 0 0 0 0 0 90 73
2019/2020689 57 24 38 68 62 37 67 95 86 74 66 15
2020/2021546 47 39 39 43 15 16 26 59 65 86 70 41
2021/2022456 4 25 42 8 38 38 26 39 56 22 68 90
2022/2023553 72 73 17 74 57 57 19 34 73 22 35 20
2023/2024413 23 52 60 36 35 57 46 32 29 42 1 0
Totale 3.222