Identifying the most appropriate sequence of cold forging operations for a new part requires a number of technological and economical evaluations concerning loads, mechanical properties of the forged component, its producibility on the machines as well as costs for equipment and associate tooling. This paper presents a methodology for estimating initial and maintenance costs for cold forging tools. This methodology is for use of planners at the early stages of process design, when the sequence of forging operations and equipment are decided and before details of the tooling system are available.

Tool cost estimating at the early stages of Cold forging

BERTI, GUIDO;
1993

Abstract

Identifying the most appropriate sequence of cold forging operations for a new part requires a number of technological and economical evaluations concerning loads, mechanical properties of the forged component, its producibility on the machines as well as costs for equipment and associate tooling. This paper presents a methodology for estimating initial and maintenance costs for cold forging tools. This methodology is for use of planners at the early stages of process design, when the sequence of forging operations and equipment are decided and before details of the tooling system are available.
1993
File in questo prodotto:
File Dimensione Formato  
1993CIRP_TOOL_COST.pdf

accesso aperto

Tipologia: Published (publisher's version)
Licenza: Accesso gratuito
Dimensione 469.41 kB
Formato Adobe PDF
469.41 kB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/127790
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 11
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact