A Direct Target for a mid-term RIB ISOL-type facility is being developed at LNL, in the framework of the R&D for the SPES project [1]. Using a 40 MeV proton beam impinging on a UCx thick target of 2.5 g/cm3 density, a production rate of 1013 in target fissions per second is expected [2]. The crucial point, when short-lived isotopes are produced in the target, is to build systems (target + ion source) with good release properties and high efficiency. Monte Carlo simulations were performed using the GEANT4 toolkit [3] and the RIBO code [4] in order to optimize our target geometry and to estimate the average release time.

Release time calculations for the SPES direct UCx target

S. CARTURAN;COLOMBO, PAOLO;DI BERNARDO, PLINIO;G. MAGGIONI;MENEGHETTI, GIOVANNI;ZANONATO, PIER LUIGI;
2007

Abstract

A Direct Target for a mid-term RIB ISOL-type facility is being developed at LNL, in the framework of the R&D for the SPES project [1]. Using a 40 MeV proton beam impinging on a UCx thick target of 2.5 g/cm3 density, a production rate of 1013 in target fissions per second is expected [2]. The crucial point, when short-lived isotopes are produced in the target, is to build systems (target + ion source) with good release properties and high efficiency. Monte Carlo simulations were performed using the GEANT4 toolkit [3] and the RIBO code [4] in order to optimize our target geometry and to estimate the average release time.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/2468469
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? 2
social impact