The Motion Decoupled Hydraulic Delivery System (MDHDS) is a new downhole tool delivery system that is deployed by wireline and uses drillstring pressure to advance a penetrometer (or other downhole tool) into the formation at the bottom of offshore boreholes. After hydraulic deployment of the penetrometer, it is completely decoupled from the BHA; this eliminates the adverse effects of ship heave. We tested the MDHDS at Site U1402 (the location of Site 1073, ODP Leg 174A), offshore New Jersey, during two days of ship time during Integrated Ocean Drilling Program (IODP) Expedition 342. In one deployment we emplaced a penetrometer successfully and documented that it was decoupled from drillstring movement. Based on this successful field test, the MDHDS has been certified by the U.S. Implementing Organization (USIO) for shipboard use. The MDHDS will replace the previous deployment system, the Colletted Delivery System. The MDHDS is an IODP-funded engineering development led by The University of Texas at Austin, in conjunction with the USIO and Stress Engineering Services. This sea trial was the culmination of a seven-year development effort that included extensive engineering design and fabrication.

The motion decoupled delivery system: A new deployment system for downhole tools is tested at the New Jersey margin

AGNINI, CLAUDIA;
2013

Abstract

The Motion Decoupled Hydraulic Delivery System (MDHDS) is a new downhole tool delivery system that is deployed by wireline and uses drillstring pressure to advance a penetrometer (or other downhole tool) into the formation at the bottom of offshore boreholes. After hydraulic deployment of the penetrometer, it is completely decoupled from the BHA; this eliminates the adverse effects of ship heave. We tested the MDHDS at Site U1402 (the location of Site 1073, ODP Leg 174A), offshore New Jersey, during two days of ship time during Integrated Ocean Drilling Program (IODP) Expedition 342. In one deployment we emplaced a penetrometer successfully and documented that it was decoupled from drillstring movement. Based on this successful field test, the MDHDS has been certified by the U.S. Implementing Organization (USIO) for shipboard use. The MDHDS will replace the previous deployment system, the Colletted Delivery System. The MDHDS is an IODP-funded engineering development led by The University of Texas at Austin, in conjunction with the USIO and Stress Engineering Services. This sea trial was the culmination of a seven-year development effort that included extensive engineering design and fabrication.
2013
File in questo prodotto:
File Dimensione Formato  
Flemings et al_2013_SciDrill.pdf

accesso aperto

Tipologia: Published (publisher's version)
Licenza: Creative commons
Dimensione 929.98 kB
Formato Adobe PDF
929.98 kB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/2776083
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact