In this study, we report the results of an action research project whose aim was to develop and implement an operating room scheduler at the Meyer University Children’s Hospital. The study offers insights into the features that make an MSS optimisation model and scheduler effective and easy to implement, and shed light on those actions facilitating their introduction and use. Specifically, it suggests that creating an effective operating room scheduler requires clustering patients in homogeneous surgery groups and developing a flexible tool that allows: scheduling surgery groups instead of actual patients, easily adding/removing constraints, changing the objective function(s) and adjusting the planning horizon. In addition, it posits that gaining the commitment of top management by showing credible preliminary results, inferring stakeholder preferences by letting them comment on tentative schedules, introducing changes gradually and involving staff at lower levels of the hospital hierarchy can significantly facilitate the scheduler development and implementation.

Development and implementation of an operating room scheduling tool: an action research study

DANESE, PAMELA
2017

Abstract

In this study, we report the results of an action research project whose aim was to develop and implement an operating room scheduler at the Meyer University Children’s Hospital. The study offers insights into the features that make an MSS optimisation model and scheduler effective and easy to implement, and shed light on those actions facilitating their introduction and use. Specifically, it suggests that creating an effective operating room scheduler requires clustering patients in homogeneous surgery groups and developing a flexible tool that allows: scheduling surgery groups instead of actual patients, easily adding/removing constraints, changing the objective function(s) and adjusting the planning horizon. In addition, it posits that gaining the commitment of top management by showing credible preliminary results, inferring stakeholder preferences by letting them comment on tentative schedules, introducing changes gradually and involving staff at lower levels of the hospital hierarchy can significantly facilitate the scheduler development and implementation.
2017
File in questo prodotto:
File Dimensione Formato  
PP&C2017.pdf

Accesso riservato

Descrizione: articolo
Tipologia: Published (Publisher's Version of Record)
Licenza: Accesso privato - non pubblico
Dimensione 1.19 MB
Formato Adobe PDF
1.19 MB Adobe PDF Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/3233635
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 40
  • ???jsp.display-item.citation.isi??? 33
  • OpenAlex ND
social impact