With the increasing demand for railway transportation infrastructure managers need improved automatic timetabling tools that provide feasible timetables with enhanced performance in short computation times. This paper proposes a hierarchical framework for timetable design which combines a microscopic and a macroscopic model of the network. The framework performs an iterative adjustment of train running and minimum headway times until a feasible and stable timetable has been generated at the microscopic level. The macroscopic model optimizes a trade-off between minimal travel times and maximal robustness using an Integer Linear Programming formulation which includes a measure for delay recovery computed by an integrated delay propagation model in a Monte Carlo setting. The application to an area of the Dutch railway network shows the ability of the approach to automatically compute a feasible, stable and robust timetable. Practitioners can use this approach both for effective timetabling and post-evaluation of existing timetables.

An integrated micro-macro approach to robust railway timetabling

Roberti R.
2016

Abstract

With the increasing demand for railway transportation infrastructure managers need improved automatic timetabling tools that provide feasible timetables with enhanced performance in short computation times. This paper proposes a hierarchical framework for timetable design which combines a microscopic and a macroscopic model of the network. The framework performs an iterative adjustment of train running and minimum headway times until a feasible and stable timetable has been generated at the microscopic level. The macroscopic model optimizes a trade-off between minimal travel times and maximal robustness using an Integer Linear Programming formulation which includes a measure for delay recovery computed by an integrated delay propagation model in a Monte Carlo setting. The application to an area of the Dutch railway network shows the ability of the approach to automatically compute a feasible, stable and robust timetable. Practitioners can use this approach both for effective timetabling and post-evaluation of existing timetables.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/3455232
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 99
  • ???jsp.display-item.citation.isi??? 79
social impact