The Virgo collaboration has just concluded its first long science run (VSR1). In these four months the detector achieved a good duty cycle, larger than 80%, and an average horizon distance for binary neutron star system sources of about 4 Mpc. An intense commissioning activity was resumed after the run was complete to further increase the performances of the detector and to prepare the Virgo+ upgrades. The detector performances during the first science run and the last commissioning achievements are briefly discussed here. © 2008 IOP Publishing Ltd.

Virgo status

Cagnoli G.;
2008

Abstract

The Virgo collaboration has just concluded its first long science run (VSR1). In these four months the detector achieved a good duty cycle, larger than 80%, and an average horizon distance for binary neutron star system sources of about 4 Mpc. An intense commissioning activity was resumed after the run was complete to further increase the performances of the detector and to prepare the Virgo+ upgrades. The detector performances during the first science run and the last commissioning achievements are briefly discussed here. © 2008 IOP Publishing Ltd.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11577/3578227
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 152
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact